Industrial

Caterpillar Corporation B-4 Plant Expansion

  • Lafayette, IN
  • 104,776 sq. ft. manufacturing plant expansion
  • Conventional steel building structure & Drilled concrete caisson foundations & Multiple underhung trolley hoists

  • DCI Project Lead: Craig Bush

  • Method of delivery: Design Build

  • Design Build Contractor: Steinberger Construction Co. of Logansport, Indiana
  • Completion: Fall 2017

Monticello Spring Company

  • Monticello, IN
  • 24,000 sq. ft. Manufacturing Expansion
  • Pre-engineered metal building structure & 120 ft. clear span frames
  • DCI Project Lead: Craig Bush

  • Method of delivery: Design Build
  • Design Build Contractor: Steinberger Construction Co., Inc. in Logansport, Indiana

  • Completion: Summer 2006

Galbreath
Corporation

  • Winamac, IN
  • 8.223 sq. ft. pre-engineered metal building structure
  • Down draft paint and decal facility with paint booth and concrete pits

  • DCI Project Lead: Craig Bush

  • Method of Delivery: Design Build

  • Design Build Contractor: Steinberger Construction Co., Inc. in Logansport, Indiana
  • Completion: Fall 2007

Wagner-Meinert Corporation

  • Logansport, IN
  • 825 sq. ft. elevated condenser platform
  • Conventional steel frame hot dipped galvanized ammonia condenser platform
  • DCI Project Lead: Craig Bush

  • Method of delivery: Design Build

  • Design Build Contractor: Steinberger Construction Co., Inc. in Logansport, Indiana
  • Completion: Summer 2011

Polymer Science,
Inc.

  • Monticello, IN
  • 1,323 sq. ft. (4 story) Coating Tower Expansion
  • Convention steel framed 4 story structure with equipment support space
  • DCI Project Lead: Craig Bush

  • Method of Delivery: Design, Bid & Build
  • Design Build Contractor: Steinberger Construction Co., Inc. in Logansport, Indiana
  • Completion: Summer 2011

City of Marion Water Works Claricone Water Tank Shelter Building

  • Marion, IN

  • 12,250 sq. ft. x 47 ft. tall shelter building expansion
  • Pre-engineered steel building structure & Drilled concrete caission building foundations
  • DCI Project Lead: Craig Bush

  • Method of delivery: Design/Build
  • Design Build Contractor: Bowman Construction Co. of Marion, Indiana

  • Completion: Summer 2012

CVS Systems,
Inc.

  • Marion, IN
  • 10,431 sq. ft. Warehouse Expansion
  • Pre-engineered metal building structure with recessed truck docks

  • DCI Project Lead: Craig Bush

  • Method of delivery: Design/Build

  • Design Build Contractor: Bowman Construction Co. in Marion, Indiana

  • Completion: Summer 2013

Pioneer Hi-Bred Corporation

  • Plymouth, IN
  • 46,020 square feet Pre-engineered metal building structure with truck docks
  • Connections to existing warehousing and logistics operations
  • DCI Project Lead: Craig Bush

  • Method of Delivery: Design Build

  • Design Build Contractor: Steinberger Construction Co., Inc. in Logansport, Indiana
  • Completion: 2008

Heraeus Electro-Nite, LLC Warehouse Addition

  • Peru, IN
  • 108,893 Square Feet – Pre-engineered metal building structure with truck docks.
  • Office space with battery charging area.
  • DCI Project Lead: Craig Bush

  • Method of Delivery: Design Build

  • Design Build Contractor: Steinberger Construction Co., Inc. of Logansport, Indiana.

  • Completion: Fall 2019

CONTACT US

If you need professional design services please fill out to get in touch.

Name(Required)